News

Saskatoon traffic bridge closed through Sunday into Monday for washing work – Saskatoon

blank

The Metropolis of Saskatoon says the bridge will probably be closed together with a portion of the street between eleventh avenue and Spadina Crescent (close to the bridge) for bridge washing work.

Detours are in place.

The venture is anticipated to take ten hours to finish, barring any unexpected circumstances.

The bridge ought to reopen to site visitors come Monday morning.


© 2021 International Information, a division of Corus Leisure Inc.

https://globalnews.ca/information/8222834/saskatoon-bridge-closed-washing/ | Saskatoon site visitors bridge closed by Sunday into Monday for laundry work – Saskatoon

Sportset

Inter Reviewed is an automatic aggregator of the all world’s media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials, please contact us by email – admin@interreviewed.com. The content will be deleted within 24 hours.

Related Articles

Back to top button