News

A bridge too far: Jefferies doubles number of ‘structurally lacking’ bridges

blank

Christiana Stephenson, communications director at the House of Representatives Democratic Caucus, where Jefferies chairs, defended her comment by noting that 112,797 bridges had been listed by ARTBA in a different category – “fair conditions. ” According to the FHWA, that means “all major structural components are acoustic but there may be some minor cross-sectional loss, cracking, bubbling or peeling.”

https://www.washingtonpost.com/politics/2021/11/18/bridge-too-far-jefferies-doubles-number-structurally-deficient-bridges/?utm_source=rss&utm_medium=referral&utm_campaign=wp_politics A bridge too far: Jefferies doubles number of ‘structurally lacking’ bridges

Huynh Nguyen

Inter Reviewed is an automatic aggregator of the all world’s media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials, please contact us by email – admin@interreviewed.com. The content will be deleted within 24 hours.

Related Articles

Back to top button